| On the approach to the bottom of Newhouse Lock, The canal side has had new stone walling installed. |
![]() |
|   |
| Below the lock. Two of the enthusiastic S.U.C.S. Work party repairing the outlet of the bye-weir. |
![]() |
|   |
| The corrode brick work has been removed and jacks have been installed to stabilise the walls whilst work is proceeding to re-build the lock. |
![]() |
|   |
| Jacks stabilise the sides whilst work proceeds to cast the re-inforced concrete base for the new lock wall. Note the shuttering in place ready for casting. |
![]() |
|   |
| Position of the top gates. Note the blocks of stone stored in the entrance ready for re-instatement. |
![]() |
|   |
| Above the lock, work is proceeding to restore the bye-weir. A new concrete channel is being cast. |
![]() |
|   |
| View of finished work on the restored side of the lock chamber. The volunteers should be proud of their acheivements. |
![]() |
|   |
| A short distance from Newhouse Lock. Below Byles Lock dredging is in progress to clear the silted channel. |
![]() |
|   |
| Thanks to the enthusiastic approach of groups of volunteers like these, the restoration of the Montgomery is proceeding at a steady but unstoppable pace. THANK YOU EVERYONE CONCERNED. |